PostPosted: Wed Mar 03, 2010 7:45 pm 
Offline

Joined: Sat Feb 20, 2010 6:00 am
Posts: 11
I have a location (A) where I store stock with minimum quantity rules for automatic procurement. All the finished stock is stored in this warehouse.

All the stock is manufactured in a different location (B) under contract from a supplier. Raw materials are also stocked with the same supplier on our behalf.

I want to set up the minimum rules based on the stock levels in location A, but the product has to be made at location B before being shipped to location A.

When needed, purchase orders for raw materials need to be delivered to location B for manufacture, but at the moment, when the scheduler auto-procures the raw materials needed for the manufacture, it still tries to send them to location A.

How can I configure the system so that the raw materials are automatically delivered to the location B while the minimum order rules are based on location A

Thanks


Top
 Profile  
 
 Post subject:
PostPosted: Wed May 26, 2010 4:55 pm 
Offline

Joined: Mon Jan 26, 2009 10:22 pm
Posts: 91
We have run into a very similar scenario that you describe here. Have you found a solution for this problem?


Top
 Profile  
 
 Post subject:
PostPosted: Mon May 31, 2010 1:01 pm 
Offline

Joined: Thu Mar 12, 2009 4:11 pm
Posts: 47
Location: PL
I am interested too and got answer that OpenERP 6.0 will containt module for that stock_location_pull (?). I didn't check it yet.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 3 posts ] 

All times are UTC + 2 hours


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:

Protected by Anti-Spam ACP