View unanswered posts | View active topics
|
Page 1 of 1
|
[ 3 posts ] |
|
| Author |
Message |
|
whitej_d
|
Post subject: scheduler procures raw materials to wrong place Posted: Wed Mar 03, 2010 7:45 pm |
|
Joined: Sat Feb 20, 2010 6:00 am Posts: 11
|
|
I have a location (A) where I store stock with minimum quantity rules for automatic procurement. All the finished stock is stored in this warehouse.
All the stock is manufactured in a different location (B) under contract from a supplier. Raw materials are also stocked with the same supplier on our behalf.
I want to set up the minimum rules based on the stock levels in location A, but the product has to be made at location B before being shipped to location A.
When needed, purchase orders for raw materials need to be delivered to location B for manufacture, but at the moment, when the scheduler auto-procures the raw materials needed for the manufacture, it still tries to send them to location A.
How can I configure the system so that the raw materials are automatically delivered to the location B while the minimum order rules are based on location A
Thanks
|
|
| Top |
|
 |
|
twenger26
|
Post subject: Posted: Wed May 26, 2010 4:55 pm |
|
Joined: Mon Jan 26, 2009 10:22 pm Posts: 91
|
|
We have run into a very similar scenario that you describe here. Have you found a solution for this problem?
|
|
| Top |
|
 |
|
Grzegorz (Cirrus.pl)
|
Post subject: Posted: Mon May 31, 2010 1:01 pm |
|
Joined: Thu Mar 12, 2009 4:11 pm Posts: 47 Location: PL
|
|
I am interested too and got answer that OpenERP 6.0 will containt module for that stock_location_pull (?). I didn't check it yet.
|
|
| Top |
|
 |
|
Page 1 of 1
|
[ 3 posts ] |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum
|